|
Guidelines on the Environmental Impact Assessment for Wind Farms |
|
|
Within the capacity building component of the project, UNDP Serbia team together with focal points from the Ministry of Environment and Spatial Planning - developed the “Guidelines on the Environmental Impact Assessment for Wind Farms“ (hereafter the Guide). The Guide is primarily intended to be used as a tool for employees of institutions tasked with carrying out EIA procedure, as well as for other interested parties. The Guide shows the legislative framework, basic information relating to the planning process and detailed information and guidelines on the EIA, identifying the possible environmental effects of the wind farms. The Guide is based on recommendations and examples from existing European practice, while the whole process is structured and shown in the context of Serbian law. |
|
|
Pancevo CB pilot project |
|
|
Stakeholders from the Ministry of Environment and Spatial Planning, Pancevo secretariat and other institutions attended the training on „Assessment of hot spots - hydrogeological aspect, pilot project Southern industrial zone“ on 26 March 2010 held in Pancevo. Presentations from the training can be downloaded here: tema_1, tema_2, tema_3a, tema_3b i geodatabaza. The capacity building pilot project is successfully completed on 7 May 2010. More than 30 participants from industries and institutions attended the presentation of project results . Presentations and project summary can be downloaded here: finalna_prezentacija__projekat_11, finalna_prezentacija__projekat_21, finalna_prezentacija__projekat_31 and exe_summary |
|
|
Assessmnet of Environmental Hot Spots - hydrogeological aspect |
|
|
Capacity Building project “Assessmnet of Environmental Hot Spots - hydrogeological aspect, pilot project Juzna industrijska zona Pancevo“ is in full swing . The team of consultants conducted on 10 December 2009 presentation of project results and project progresss to date and especially the geodatabase design and its characteristics. The geodata base includes all available single groundwater monitoring results from 96 piezometers, summary interpretation presented through 12 lateral and longitudinal hydrogeological profiles of „Juzna zona“ as well as chemical analyses for polluting substances. The data cover period from 2000 to date. The discussion on further activities and practical isuse with focal points from the Secretariat of Environment of Municipality of Pancevo and Ministry of Environment and Spatial Planning was very constructive.Power point presentation of project results and project progresss to date can be downloaded here:
|
|
|
The CB pilot-project on Integrated Pollution Prevention Control (IPPC) permitting process is complet |
|
The final workshop for CB pilot-project on Integrated Pollution Prevention Control (IPPC) permitting process – Results of the project and simulation of permits was held on 24 November 2009 in Belgrade. The project involved the preparation of two IPPC permits in a process that simulates as far as practicable that required under the Law on IPPC (OG RS, No. 135/04).
|
|
Read more...
|
|
|
Workshop on the EU legislation in the field of water protection |
|
The UNDP Serbia in cooperation with the Ministry of Environment and Spatial Planning of the Republic of Serbia, organizes workshop with the aim of capacity building of experts/decision makers/institutions in the field of water protection in the EU legislation. The workshop will be held 13-14 and 16 July 2009 in Belgrade.
|
|
Read more...
|
|
|
|